Monday 1 June 2015

47 105 Update

The work on 47105 continues and today saw the engine room roof lifted off and placed on the wagon where it will receive attention to the corroded metal work. 



This also gives much more space to work in the engine room which has had the walls stripped and the gauges and pipe work refurbished.


The equipment room is nearing completion but is missing the refurbished exhausters which are still away.


The equipment room was completely emptied of machines such as the compressors and exhausters, the numerous air tanks, brake frames and the multitude of pipe work among other things. These (with the exception of the exhausters) have all been refurbished and refitting of this complex jigsaw is ongoing.

Update from Rich Watson